Supply & OperationsResource Planning

Resource Planning

Who is available, who is over-committed, and where to move people next month.

630h gap
Engineers
54
Technicians
90
Average utilization
84%
4%
Planned overtime
705 h

Utilization by region

Redeployment plan
Dammam runs at 96% utilization while Cairo sits at 74%. Moving two technicians for six weeks covers the shutdown peak without overtime and keeps SLA risk under 5%. Certification check: both technicians hold the required calibration qualification.

Teams

RegionEngineersTechniciansUtilizationOvertime
Riyadh69
72%
40h
Jeddah914
79%
71h
Dammam1219
86%
102h
Dubai611
93%
133h
Cairo916
74%
164h
Doha1221
81%
195h

Skill demand by service line

ServiceRequired hoursEngineersTechniciansSubcontract
Preventive Maintenance1,1131314110
Corrective Maintenance1,6571218144
Calibration Service3,001520304
Installation & Commissioning3,7122315425
Managed IT Support2,0411623231
Network Operations1,7831034590
Field Inspection4,01420181,145
Engineering Consultancy1,869191575
Shutdown Support3,8192338171
Spare Parts Management3,1701931644

Upload workforce roster

Engineers and technicians available per period.

Drop a CSV here or

Expected columns: resource, role, region, available_hours

Ask ForeSight AI

Answers are grounded in the platform's seeded workspace data plus any CSV you uploaded.

Seeded data in context